
New Smyrna Beach, FL - Another portion of the St. Johns River to Sea Loop Trail is up for discussion tonight in New Smyrna Beach. FDOT Communications Officer Jessica Ottaviano said the public information meeting is in regards to plans for about 1.2 miles of multi-use trail along Myrtle Avenue from 10th Street to Lytle Avenue (otherwise known as S.R. 44).
The is another piece of the Trail. Attendees will be able to see the plans for the proposed improvements which include a 12-foot-wide asphalt trail adjacent to the existing roadway on Myrtle Avenue, restriping of sidewalks to facilitate trail use and modifications to the drainage ditch on the east side of Myrtle Avenue. Ottaviano said tonight's meeting is basically to discuss the design of the project and that work on the design is expected to continue through spring 2023. Funding for this phase of construction is already in place with work expected to begin in the fall of 2023.
Ottaviano says the River to Sea Loop Trail Network actually connects different parts of Florida around the St. John's River. The Myrtle Avenue project is just a small part of the 260 mile paved multi-use Florida SUNTrail. For those that can't attend tonight's meeting, she says that you can find all the project documents presented at the meeting online at cflroads.com and search for Myrtle Avenue.
The meeting will be held in an open house format with doors at the Brannon Center on Riverside Drive in New Smyrna Beach opening at 5 p.m. with the project information available until 7 p.m. A presentation on the project will run on a continuous loop throughout the meeting with information on display. Project representatives will be on hand to discuss the improvements and enter questions